ReadyNAS
Advanced Network Attached Storage
 
 
 
 
Backup
       
Backup Schedule

No backup jobs have been scheduled.
Backup Button Setup

You can program the Backup button on the front of this device to execute one or more backup jobs that you have defined above. The jobs will be executed in the order that you specify here when the Backup button is pressed. If no jobs are selected for the button, depressing the button will backup the content of the backup share to the storage device connected to the front USB port.

View default backup button job logs Clear default backup button job logs
 
 
Copyright © 1996-2008 NETGEAR ®
Volume: Volume C: RAID Level X, Not redundant.  A disk failure will render this volume dead., 45 GB (9%) of 461 GB used Disk: Channel 1: WDC WD5000AACS-22ZUB0 465 GB Channel 2: Not present Fan: Fan 1: 1829  RPM UPS: UPS 1: Not present